Navi Mumbai Metro

navi mumbai

NAVI MUMBAI METRO RAIL





Line 1 is planned to be developed in 3 phases:

Line 1
Phase Terminal Length Stations Cost
I Belapur-Kharghar-Taloja-Pendhar 11.10 kilometres (6.90 mi) 11 ₹1,985 crore (US$280 million)
II MIDC Taloja-Kalamboli–Khandeshwar
(extension to Airport proposed)
10.30 kilometres (6.40 mi) 8 ₹1,509 crore (US$210 million)
III Interlink between Pendhar and MIDC 2 kilometres (1.2 mi) 1 ₹574 crore (US$80 million)
Total 23.40 kilometres (14.54 mi) 20 ₹4,068 crore (US$570 million)

Rolling stock

In 2014, the Chinese company CSR Zhuzhou signed a contract with CIDCO to supply rolling stock for the first phase of the metro’s Line 1. The three-car trainsets would be 64.6 metres (212 ft) long and 3.1 metres (10 ft) wide, with a passenger capacity of around 1,100 and a maximum speed of approximately 80 kilometres per hour (50 mph).The trains would feature stainless steel bodies, air-conditioning and LED lighting