Hyderabad Metro

hmrl

HYDERABAD METRO RAIL LTD




 

Stations:

3 Corridors - 66 Stations - 3 Interchange Stations.

Corridor I Corridor II Corridor III
Miyapur to L B Nagar - 27 Stations JBS to Falaknuma - 16 Stations Nagole to Shilparamam - 23 Stations

 

Stations – Corridor I:
Miyapur JNTU College KPHB Colony
Kukatpally Balanagar Moosapet
Bharat Nagar Erragadda ESI Hospital
S R Nagar Ameerpet Punjagutta
Irrum Manzil Khairatabad Lakdikapul
Assembly Nampally Gandhi Bhavan
Osmania Medical College MG Bus station Malakpet
New Market Musarambagh Dilsukhnagar
Chaitanyapuri Victoria Memorial L B Nagar

 

Stations – Corridor II:
JBS Parade Grounds Secunderabad
Gandhi Hospital Musheerabad RTC Cross Roads
Chikkadpally Narayanguda Sultan Bazar
M G Bus Station Salarjung Museum Charminar
Shalibanda Shamsher Gunj Jungametta
Falaknuma

 

Stations - Corridor III:
Nagole Uppal Survey of India
NGRI Habsiguda Tarnaka
Mettuguda Secunderabad Parade Grounds
Paradise Rasool Pura Prakash Nagar
Begumpet Ameerpet Madhura Nagar
Yusuf Guda Road No 5 Jubilee Hills Jubilee Hills Check Post
Pedamma Temple Madhapur Durgam Chervu
HITEC City Shilparamam

 

Interchange Stations:
Ameerpet Station Corridor I & III
M G B S Station Corridor I & II
Parade Grounds Station Corridor II & III

Rolling Stock

Train Set 3 Cars train set (DMC‐TC‐DMC)
Extendable to 6 Cars train set (DMC‐TC‐MC‐MC‐TC‐DMC)
Gauge Standard Gauge (1435 mm)
Traction 25 kV AC Overhead Catenary, Single phase and 50 Hz frequency
Maximum Design Speed 90 kmph
Maximum Operating Speed 80 Kmph
Average Speed 33 kmph
Head way between two trains 3 minutes during peak and 15 minutes during lean hours
Dwell Time 20 seconds at stations
Maximum Axle Load 17 Ton with 8 Passenger/Square metre in standing area

Track work

SN. CRITERIA DIMENSION
1. Gauge 1435 mm
2. Design speed
Max. operating speed
90 Kmph
80 Kmph
3. Max. axle load, loaded condition 17 tonne
4. Maximum Gradient
Normal / desirable Limit
Exceptional Limit
2.5%
4%
5. Sharpest vertical curve radius
Sharpest horizontal curve radius
1500m
120 m (main line track)
90 m (depot track
6. Traction power collection Overhead Catenary system (OCS) at 25kV(AC)
Rails shall be used for traction return current.
7. Inclination of Rail 1 in 40
8. Wheel tread profile UIC 510-2 (S1002); to be interfaced with Rolling Stock Contractor.
9. Rail profile UIC 60 (861-3)

AFC

The proposed system comprises of following key sub-systems:

  • Automatic Gates
  • Ticket Vending Machines
  • Add Value Machines
  • Ticket Office Machines
  • Ticket Readers
  • Portable Ticket Analysers

Power Supply & Traction

OHE at Main Line Conventional regulated type
OHE at Yards Tramway regulated type
System voltage 25 kV AC, 1Ø, 50 Hz
Design Speed 90 kmph
Operational Speed 80 kmph
Auxiliary Power Transformer 132/33 kV, oil type
Traction Power Transformer 132/25 kV, oil type
Auxiliary Transformer (at Station & Depots) 33/415 V, Dry Type
33 kV cable Ring main network
Height of OHE above the Rail level 5.00 Meter

Signalling & Train Control

  • The advanced signalling & Train Control technology, Communication Based Train Control (CBTC), is adopted for Hyderabad Metro to control the trains. Hyderabad Metro would be first in India to claim train control by CBTC technology. The trains running on three corridors will be controlled and monitored from state-of-the-art Operation Control Centre (OCC) at Uppal.
  • The trains can run with headway of 90 Sec to tackle commuters during office peak hours in morning and in evening. The overview display panel will mimic all three corridors and indicate current locations of all trains running on these corridors. The OCC shall be the primary control centre having a back-up control centre at Uppal depot to take over the operation if the OCC to be evacuated due to unforeseen situation.